Engineering Products

• Field Inspection
• Field Inspection Daily Report
• Review of jobsite progress and quality
• Assistance in obtaining field inspectors.
© 2009  Perry Petersen   All rights reserved.
Rebar in Top Slab for 36 foot deep addition to Existing Pump
Station.  Inspection found substantial errors that were
corrected before concrete placement.  Detail pre-pour
Checklist helps inspection get the right result per plan.
PROJECT ENGINEERING
Perry Petersen, P.E.             (650) 255-7625           perry@perrypetersen.com
Project Engineering, Constructibility Review

A Constructibility Review of the plans and
specifications during about 90% stage is done by
very experienced construction engineers. This is to
consider the contract's clarity, reasonableness and
potential for change orders and claims. After the
review, the comments are considered by the owner
and designer, as to what changes might be made to
improve the contract and bids received.  Such a
review typically results in some savings, but the
actual savings by avoiding changes and claims is
speculative although genuine.  Perry has led and
participated in many of these reviews.


Jobsite Engineering, Inspection

The purpose of Construction Management started
with field inspection, to make sure the owner was
getting the product shown in the plans and
specifications.

During his varied career, Perry has continued with
regular field work to learn of project characteristics,
check on field inspection work, understand current
issues, and learn about projects that are underway.

Perry's contacts include top quality construction
inspectors that he has worked with and many that
he has interviewed and hired.


Current Assignments:

Currently, Perry reviews field work against the
contractor's schedule for a large pipeline
rehabilitation project, to verify that the schedule
represents the progress accurately..

Other Assignments:

Previous work includes field inspection at the San
Francisco International Airport, the Sacramento
County Wastewater interceptors, the Union Sanitary
District pump stations and pipeline, the San
Francisco Public Utility Commission water system,
the Oro Loma Sanitary plant upgrade, the Monterey
County Water Resources Agency seawater intrusion
system, and many others.

Perry can be reached at 650-255-7625, or by email
at perry@perrypetersen.com
© 2008 - 2013  Perry Petersen   All rights reserved.
Perry Petersen, P.E.
Construction Management